নির্মাণ উপকরণ পরীক্ষণের দর
Quality control measure is the primary criterion of any standard material. The performance of a product will only be sustainable if its quality is properly controlled through conducting standard tests in a well equipped laboratory. It is also ture in case of construction system where huge amount of construction materials are used involving lot of investment. Housing and Building Research Institute has the laboratories to facilitate all sort of standard tests according to the specification. A few of the available tests and their costs are indicated below. | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Physical Tests | Effective from MARCH 01, 2015 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
মৃত্তিকা পরীক্ষণের মূল্য তালিকা
S.L. no |
Name of the Work |
Unit |
Approved Rate (TK) excluding Vat |
1 |
Preparation, Packing and Transportation of Drilling |
LS |
Actual cost |
2 |
Installation of Drilling Equipment at side |
Each site |
3,500.00 |
3 |
Installation of water supply arrangement & minor repair |
Each site |
2,700.00 |
4 |
Setting up temporary accommodation for staff at site |
Each site |
2,600.00 |
5 |
Execution of boring : (meter) |
||
a) Between 0 m. to 15 m. |
Per meter |
230.00 |
|
b) Between 15 m. to 30 m. |
Per meter |
270.00 |
|
c) Between 30 m. to 45 m. |
Per meter |
350.00 |
|
6 |
Making platform for execution of Boring in water |
Each |
Actual cost |
7 |
Idle time due to non availability of point |
Day (8 hrs) |
3,600.00 |
8 |
Collection of Disturbed samples at every 1.50 m. |
Each |
135.00 |
9 |
Collection of Undisturbed samples by Shelby tube |
Each |
220.00 |
10 |
Execution of Standard Penetration Test : |
||
a) Between 0 m. to 15 m. |
Per meter |
85.00 |
|
b) Between 15 m. to 30 m. |
Per meter |
120.00 |
|
c) Between 30 m. to 45 m. |
Per meter |
140.00 |
|
11 |
Cone Penetration Test |
||
Between 0 m. to 15 m. |
Per meter |
2,200.00 |
|
|
|||
S.L. no |
Name of the Work |
Unit |
Approved Rate (TK) excluding Vat |
1 |
Specific Gravity |
Each |
1,600.00 |
2 |
Natural Moisture Content |
Each |
850.00 |
3 |
Visual Inspection and Classification |
Each |
135.00 |
4 |
Sieve Analysis |
Each |
850.00 |
5 |
Sieve and Hydrometer Combined Analysis (Including Sp. |
Each |
2,200.00 |
6 |
Unit Weight (Wet & Dry) |
Each |
1,650.00 |
7 |
In- situ Density Test(Excluding field visit) |
Each |
6,500.00 |
8 |
Liquid Limit & Plastic Limit |
Each |
3,000.00 |
9 |
Shrinkage Limit |
Each |
1,400.00 |
10 |
Porosity, Void Ratio and Degree of Saturation |
Each |
2,700.00 |
11 |
Unconfined Compressive Test : |
||
a) Undisturbed |
Each |
3,400.00 |
|
b) Remolded |
Each |
2,600.00 |
|
12 |
Compaction Test : |
||
a) Standard AASHO |
Each |
5,500.00 |
|
b) Modified AASHO |
Each |
6,400.00 |
|
13 |
One Dimensional Consolidation (Full) |
Each |
13,500.00 |
14 |
One Dimensional Consolidation Test |
|
|
(e-log p) |
Each |
11,200.00 |
|
15 |
Direct Shear Test |
Each |
4,300.00 |
16 |
Tri axial Shear Test : |
|
|
a) Unconsolidated Undrained |
Each |
10,500.00 |
|
b) Consolidated Undrained |
Each |
14,500.00 |
|
c) Consolidated Drained |
Each |
7,200.00 |
|
17 |
Permeability Test |
||
a) Cohesive |
Each |
11,000.00 |
|
b) Non-cohesive |
Each |
5,200.00 |
|
18 |
Differential Swelling Index |
Each |
4,500.00 |
19 |
Swelling Potential |
Each |
8,300.00 |
20 |
Preparation of Final Report (Each set of five copies) |
Each set |
5,500.00 |
21 |
Bearing Capacity Analysis |
per meter |
335.00 |